Selected Area:
|
|
County:  Hancock
|
|
Begin:  05/24/22 10:38 AM
|
|
Traffic Impact:  Closed
|
|
End:  12/29/28 04:00 PM
|
Direction:  Westbound
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  The US 90 drawbridge over the Pearl River will be closed for emergency repairs. Detour signage will be in place to direct motorists. Motorists should use an alternate route. |
|
Last Updated:  08/25/26 09:53 PM
|
|
|
|
|
County:  Simpson
|
|
Begin:  09/18/24 11:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  08/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
|
|
Last Updated:  08/10/26 10:30 AM
|
|
|
|
|
County:  Yalobusha
|
|
Begin:  02/09/26 07:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  09/04/26 12:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
|
|
Last Updated:  08/04/26 09:59 AM
|
|
|
|
|
County:  Tippah
|
|
Begin:  07/27/26 08:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  08/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  07/27/26 11:40 AM
|
|
|
|
|
County:  Franklin
|
|
Begin:  11/06/23 08:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  10/15/26 08:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Detour signage will be in place. |
|
Last Updated:  07/16/26 09:57 AM
|
|
|
|
|
County:  Neshoba
|
|
Begin:  11/03/25 09:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  10/01/26 09:00 AM
|
Direction:  Westbound
|
|
Lanes:  Road closed
|
Justification:  Road Work- Other
|
|
|
|
Last Updated:  07/01/26 08:57 AM
|
|
|
|
|
County:  Carroll
|
|
Begin:  04/24/24 05:00 PM
|
|
Traffic Impact:  Closed
|
|
End:  09/30/26 09:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
|
|
Last Updated:  06/30/26 08:57 AM
|
|
|
|
|
County:  Madison
|
|
Begin:  04/11/25 09:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  10/16/28 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Motorists are advised to seek an alternate route. |
|
Last Updated:  06/11/26 01:52 PM
|
|
|
|
|
County:  Lauderdale
|
|
Begin:  05/18/26 07:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  01/06/27 07:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Traffic control and detour signage will be in place to provide access to I-20 and detour traffic around the closure. Drivers should slow down and be on high alert for posted signage and road crews for the length of the project. |
|
Last Updated:  05/01/26 12:40 PM
|
|
|
|
|
County:  Newton
|
|
Begin:  05/06/26 07:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  01/06/27 07:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Traffic control and detour signage will be in place. Drivers should slow down and be on high alert for posted signage and road crews for the length of the project. |
|
Last Updated:  05/01/26 12:40 PM
|
|
|
|
|
County:  Tippah
|
|
Begin:  04/13/26 08:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  10/13/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Other
|
|
|
|
Last Updated:  04/13/26 10:03 AM
|
|
|
|
|
County:  Smith
|
|
Begin:  03/12/26 12:00 PM
|
|
Traffic Impact:  Closed
|
|
End:  09/11/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  MS 481 is closed 2 miles west of MS 35. |
|
Last Updated:  03/12/26 10:55 AM
|
|
|
|
|
County:  Newton
|
|
Begin:  10/16/25 06:00 AM
|
|
Traffic Impact:  Closed
|
|
End:  03/06/27 08:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Road closed
|
Justification:  Road Work- Bridge Replacement
|
|
| | Additional Information:  Traffic control and detour signage will be in place to reroute traffic around the closure on I-20 between the Newton and Hickory interchanges. Drivers should slow down and be alert for posted signage and road crews. |
|
Last Updated:  03/02/26 03:31 PM
|
|
|
|
|
County:  Hancock
|
|
|
|
Traffic Impact:  Moderate
|
|
Approximate Duration:  55 minutes
|
Direction:  Northbound
|
|
Lanes:  Expect delays
|
Justification:  Incident- Crash
|
|
|
|
Last Updated:  08/30/26 02:18 PM
|
|
|
|
|
County:  Jackson
|
|
Begin:  01/21/26 07:00 AM
|
|
Traffic Impact:  High
|
|
End:  03/05/27 05:00 PM
|
Direction:  Northbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Traffic Switch
|
|
| | Additional Information:  Northbound traffic will be placed on the newly constructed southbound side in a head-to-head configuration for approximately 4 miles on MS 57 from I-10 to just north of Humphrey Rd. while crews work on the northbound lanes. Use extra caution when driving in head-to-head traffic. No wide loads permitted. |
|
Last Updated:  08/28/26 05:00 PM
|
|
|
|
|
County:  Leake
|
|
Begin:  06/11/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/04/26 07:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Roadwork will occur daily from 6:00 AM - 7:00 PM. Alternating lane closures. |
|
Last Updated:  08/28/26 04:55 PM
|
|
|
|
|
County:  Alcorn
|
|
Begin:  08/20/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  08/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/28/26 04:40 PM
|
|
|
|
|
County:  Pike
|
|
Begin:  07/08/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 05:00 PM
|
Direction:  Southbound
|
|
Lanes:  Left lane closed
|
Justification:  Road Work- Clearing Right of Way
|
|
|
|
Last Updated:  08/28/26 04:29 PM
|
|
|
|
|
County:  Pike
|
|
Begin:  08/10/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/03/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Flaggers will be present. |
|
Last Updated:  08/28/26 04:25 PM
|
|
|
|
|
County:  Carroll
|
|
Begin:  07/28/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Clearing Right of Way
|
|
| | Additional Information:  Traffic control measures will be in place. |
|
Last Updated:  08/28/26 04:25 PM
|
|
|
|
|
County:  Carroll
|
|
Begin:  07/28/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Clearing Right of Way
|
|
| | Additional Information:  Traffic control measures will be in place. |
|
Last Updated:  08/28/26 04:25 PM
|
|
|
|
|
County:  Carroll
|
|
Begin:  07/28/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Clearing Right of Way
|
|
| | Additional Information:  Traffic control measures will be in place. |
|
Last Updated:  08/28/26 04:24 PM
|
|
|
|
|
County:  Pearl River
|
|
Begin:  10/03/25 04:27 PM
|
|
Traffic Impact:  Moderate
|
|
End:  10/09/26 03:00 PM
|
Direction:  Northbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Replacement
|
|
| | Additional Information:  Crews are staged on the Hobolochitto Creek Bridge. Access to Carrol St. and 6th St. is temporarily closed. |
|
Last Updated:  08/28/26 03:22 PM
|
|
|
|
|
County:  Harrison
|
|
Begin:  09/02/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/03/26 04:30 PM
|
Direction:  Westbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Other
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/28/26 01:48 PM
|
|
|
|
|
County:  Harrison
|
|
Begin:  08/31/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/01/26 04:30 PM
|
Direction:  Eastbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Other
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/28/26 01:48 PM
|
|
|
|
|
County:  Tishomingo
|
|
Begin:  08/27/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/18/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/27/26 03:01 PM
|
|
|
|
|
County:  Hinds
|
|
Begin:  04/14/25 03:30 PM
|
|
Traffic Impact:  High
|
|
End:  10/26/26 05:00 PM
|
Direction:  Westbound
|
|
Lanes:  Right lane closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  No Wide Loads over 17 feet are not permitted through the work zone and should seek an alternate route. |
|
Last Updated:  08/27/26 10:01 AM
|
|
|
|
|
County:  Forrest
|
|
Begin:  03/22/26 07:00 PM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Crews will be on scene from 7 PM to 6 AM; expect delays and alternating lane closures as crews complete work in the area. |
|
Last Updated:  08/26/26 08:31 PM
|
|
|
|
|
County:  Forrest
|
|
Begin:  06/14/26 08:00 PM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. Motorists should expect delays in the area and use extreme caution around roadside workers. |
|
Last Updated:  08/26/26 08:28 PM
|
|
|
|
|
County:  Harrison
|
|
Begin:  08/07/26 07:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/04/26 05:30 PM
|
Direction:  Eastbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Turn Lane Construction
|
|
| | Additional Information:  Crews will be staged in the median. |
|
Last Updated:  08/25/26 09:58 PM
|
|
|
|
|
County:  Panola
|
|
Begin:  08/25/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/10/26 09:00 AM
|
Direction:  Southbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/24/26 10:22 PM
|
|
|
|
|
County:  Harrison
|
|
Begin:  08/10/26 07:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/11/26 04:30 PM
|
Direction:  Northbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  There will be no eastbound access to South Swan Road, as crews complete work at the intersection. Detour signage will be in place. |
|
Last Updated:  08/24/26 09:35 AM
|
|
|
|
|
County:  Warren
|
|
Begin:  08/21/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/30/26 05:00 PM
|
Direction:  Westbound
|
|
Lanes:  Right lane closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  The Louisiana Department of Transportation is performing bridge maintenance on I-20 Westbound at the Mississippi River Bridge. No wide loads over 11 feet, wide loads must seek an alternate route. |
|
Last Updated:  08/24/26 06:04 AM
|
|
|
|
|
County:  Leake
|
|
Begin:  08/21/26 06:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/30/26 07:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Roadwork will occur daily from 6:30 AM - 7:00 PM. |
|
Last Updated:  08/21/26 08:23 AM
|
|
|
|
|
County:  Pearl River
|
|
Begin:  08/20/26 07:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/21/26 04:30 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. Flaggers will be present. |
|
Last Updated:  08/20/26 07:55 AM
|
|
|
|
|
County:  Leake
|
|
Begin:  08/19/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/02/26 06:00 PM
|
Direction:  Westbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  08/19/26 06:01 PM
|
|
|
|
|
County:  Pike
|
|
Begin:  09/13/24 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 05:00 PM
|
Direction:  Westbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Roundabout Construction
|
|
| | Additional Information:  No Wide Loads Over 12 Feet. |
|
Last Updated:  08/19/26 04:38 PM
|
|
|
|
|
County:  Pike
|
|
Begin:  05/04/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/31/26 05:00 PM
|
Direction:  Southbound
|
|
Lanes:  Right lane closed
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  08/19/26 04:38 PM
|
|
|
|
|
County:  Pike
|
|
Begin:  10/25/25 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 05:00 PM
|
Direction:  Northbound
|
|
Lanes:  Left lane closed
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  08/19/26 04:38 PM
|
|
|
|
|
County:  Marshall
|
|
Begin:  08/17/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/15/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating locations and directions. Roadwork will occur daily from 7:00 AM - 6:00 PM. |
|
Last Updated:  08/18/26 06:44 AM
|
|
|
|
|
County:  Marshall
|
|
Begin:  08/17/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/15/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Left lane closed
|
Justification:  Road Work- Barrier Wall / Divider
|
|
| | Additional Information:  Alternating lane closure to remain in place day and night. |
|
Last Updated:  08/18/26 06:43 AM
|
|
|
|
|
County:  Marshall
|
|
Begin:  08/17/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/15/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating locations and directions. Roadwork will occur daily from 7:00 AM to 6:00 PM. |
|
Last Updated:  08/18/26 06:42 AM
|
|
|
|
|
County:  Harrison
|
|
Begin:  08/03/26 07:00 AM
|
|
Traffic Impact:  Minimal
|
|
End:  09/11/26 03:00 PM
|
Direction:  Westbound
|
|
Lanes:  On right shoulder
|
Justification:  Road Work- Turn Lane Construction
|
|
|
|
Last Updated:  08/17/26 11:48 AM
|
|
|
|
|
County:  Harrison
|
|
Begin:  08/17/26 07:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/11/26 04:30 PM
|
Direction:  Southbound
|
|
Lanes:  Right lane closed
|
Justification:  Road Work- Lane Shift
|
|
| | Additional Information:  Crews will be stationed adjacent to the old Hancock Bank building. |
|
Last Updated:  08/17/26 07:52 AM
|
|
|
|
|
County:  Lincoln
|
|
Begin:  08/13/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  08/31/26 05:00 PM
|
Direction:  Eastbound
|
|
Lanes:  Left lane closed
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  08/14/26 07:53 AM
|
|
|
|
|
County:  Winston
|
|
Begin:  04/30/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/10/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  No Wide Loads. Alternating lane closures. Road work will occur daily from 6:00 AM to 6:00 PM. |
|
Last Updated:  08/13/26 05:38 PM
|
|
|
|
|
County:  Union
|
|
Begin:  11/03/25 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  11/02/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  No Wide Loads - Detour MS 348 to MS 15. Alternating lane closures. Roadwork will occur daily from 7:00 AM - 5:00 PM. |
|
Last Updated:  08/13/26 07:22 AM
|
|
|
|
|
County:  Jones
|
|
Begin:  07/13/26 07:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/30/26 04:30 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Clearing Right of Way
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/12/26 06:05 PM
|
|
|
|
|
County:  Warren
|
|
Begin:  04/28/25 07:00 AM
|
|
Traffic Impact:  High
|
|
End:  10/26/26 05:00 PM
|
Direction:  Eastbound
|
|
Lanes:  Left lane closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  No wide loads over 17 feet, seek alternate route. |
|
Last Updated:  08/12/26 09:48 AM
|
|
|
|
|
County:  Lafayette
|
|
Begin:  07/08/26 12:30 PM
|
|
Traffic Impact:  Moderate
|
|
End:  11/09/26 08:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Other
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  08/12/26 09:44 AM
|
|
|
|
|
County:  Prentiss
|
|
Begin:  08/13/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/30/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Flagmen will be present. |
|
Last Updated:  08/10/26 02:36 PM
|
|
|
|
|
County:  Lee
|
|
Begin:  08/13/26 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  12/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Flagman will be present. |
|
Last Updated:  08/10/26 02:32 PM
|
|
|
|
|
County:  Marshall
|
|
Begin:  07/24/26 05:00 PM
|
|
Traffic Impact:  Moderate
|
|
End:  09/15/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. Roadwork will occur daily from 7:00 AM - 6:00 PM. |
|
Last Updated:  08/10/26 09:30 AM
|
|
|
|
|
County:  Copiah
|
|
Begin:  08/06/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  08/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Clearing Right of Way
|
|
|
|
Last Updated:  08/06/26 08:42 AM
|
|
|
|
|
County:  Union
|
|
Begin:  03/25/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/09/26 10:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Traffic will be reduced to one lane. Traffic control devices will be in place. |
|
Last Updated:  08/06/26 08:10 AM
|
|
|
|
|
County:  Yalobusha
|
|
Begin:  10/13/25 05:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/04/26 12:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Closed to through traffic. |
|
Last Updated:  08/04/26 09:59 AM
|
|
|
|
|
County:  George
|
|
Begin:  08/03/26 03:00 PM
|
|
Traffic Impact:  Moderate
|
|
End:  10/09/26 02:30 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Motorists should use extreme caution in the area and adhere to the traffic signals in place as crews complete emergency repairs. The roadway may be closed again in order for crews to complete repair work on this section of highway. Motorists are reminded to be on high alert for roadside workers. |
|
Last Updated:  08/03/26 01:33 PM
|
|
|
|
|
County:  Lincoln
|
|
Begin:  03/09/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/01/26 09:00 AM
|
Direction:  Eastbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Median Crossover Closure
|
|
| | Additional Information:  Median Crossover for Brookway Blvd East and I-55 South Entrance Ramp closed. Use Detour. |
|
Last Updated:  08/03/26 08:40 AM
|
|
|
|
|
County:  Washington
|
|
Begin:  05/07/26 02:30 PM
|
|
Traffic Impact:  Moderate
|
|
End:  02/01/27 09:00 AM
|
Direction:  Northbound
|
|
Lanes:  Left lane closed
|
Justification:  Road Work- Other
|
|
|
|
Last Updated:  08/01/26 05:36 PM
|
|
|
|
|
County:  Yalobusha
|
|
Begin:  06/26/24 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  12/31/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Alternating lane closures. Flagmen will be present. |
|
Last Updated:  07/31/26 04:48 PM
|
|
|
|
|
County:  Yalobusha
|
|
Begin:  06/16/26 07:00 PM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 01:00 PM
|
Direction:  Northbound
|
|
Lanes:  Right lane closed
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
|
|
Last Updated:  07/31/26 09:29 AM
|
|
|
|
|
County:  Yazoo
|
|
Begin:  07/28/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/25/26 05:00 PM
|
Direction:  Northbound
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Alternating lane closures. No Wide Loads. |
|
Last Updated:  07/24/26 11:39 AM
|
|
|
|
|
County:  Itawamba
|
|
Begin:  07/15/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  07/15/26 03:43 PM
|
|
|
|
|
County:  Jones
|
|
Begin:  07/10/26 07:30 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/30/26 04:30 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Clearing Right of Way
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  07/13/26 07:56 AM
|
|
|
|
|
County:  Rankin
|
|
Begin:  07/10/26 07:00 PM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 07:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  07/13/26 06:22 AM
|
|
|
|
|
County:  Harrison
|
|
Begin:  01/27/26 04:32 PM
|
|
Traffic Impact:  Moderate
|
|
End:  12/11/26 05:32 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Safety Improvements
|
|
| | Additional Information:  Alternating lane closures. Motorists should be on high alert for roadside workers. |
|
Last Updated:  06/26/26 05:59 PM
|
|
|
|
|
County:  Monroe
|
|
Begin:  06/24/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  08/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Flagmen will be present. |
|
Last Updated:  06/24/26 12:38 PM
|
|
|
|
|
County:  Itawamba
|
|
Begin:  06/02/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  11/30/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Intersection Improvements
|
|
|
|
Last Updated:  06/02/26 11:22 AM
|
|
|
|
|
County:  Lowndes
|
|
Begin:  06/02/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/23/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. Traffic control measures will be in place. |
|
Last Updated:  06/02/26 10:34 AM
|
|
|
|
|
County:  Noxubee
|
|
Begin:  02/25/26 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  11/18/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Detour in place. |
|
Last Updated:  05/26/26 08:38 AM
|
|
|
|
|
County:  Lincoln
|
|
Begin:  12/01/25 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/30/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Roundabout Construction
|
|
|
|
Last Updated:  05/19/26 12:15 PM
|
|
|
|
|
County:  Marion
|
|
Begin:  01/29/24 10:00 AM
|
|
Traffic Impact:  High
|
|
End:  01/04/27 10:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Construction
|
|
| | Additional Information:  Westbound traffic will be placed on the newly constructed Eastbound bridge in a head-to-head configuration until the Westbound bridge replacement project is complete. No wide loads over 10 feet. |
|
Last Updated:  04/10/26 10:02 AM
|
|
|
|
|
County:  Forrest
|
|
Begin:  03/18/24 06:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  12/25/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. Motorists are reminded to be on high alert for roadside workers. |
|
Last Updated:  03/16/26 12:49 PM
|
|
|
|
|
County:  Monroe
|
|
Begin:  03/13/26 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/31/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  03/13/26 09:10 AM
|
|
|
|
|
County:  Pontotoc
|
|
Begin:  10/02/25 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/01/26 09:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Bridge Repair / Inspection
|
|
| | Additional Information:  Alternating lane closures. Roadwork will occur daily from 7:00 AM - 5:00 PM. |
|
Last Updated:  03/03/26 08:44 AM
|
|
|
|
|
County:  Harrison
|
|
Begin:  03/14/24 02:36 PM
|
|
Traffic Impact:  Moderate
|
|
End:  03/01/27 03:36 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. Motorists should use caution when approaching the area. Westbound commercial traffic is encouraged to use the left lane from Exit 20 to Exit 16. . |
|
Last Updated:  02/25/26 07:09 PM
|
|
|
|
|
County:  Harrison
|
|
Begin:  08/06/24 11:22 AM
|
|
Traffic Impact:  Moderate
|
|
End:  06/04/27 04:30 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Highway Widening
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  02/09/26 10:23 AM
|
|
|
|
|
County:  Lafayette
|
|
Begin:  12/04/25 10:15 AM
|
|
Traffic Impact:  Moderate
|
|
End:  10/01/29 07:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Other
|
|
|
|
Last Updated:  12/04/25 10:21 AM
|
|
|
|
|
County:  Union
|
|
Begin:  09/13/23 07:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  09/14/26 04:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
|
|
Last Updated:  10/30/25 08:32 AM
|
|
|
|
|
County:  Neshoba
|
|
Begin:  07/07/25 09:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  07/07/28 09:00 AM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Lane Widening
|
|
|
|
Last Updated:  07/03/25 08:17 AM
|
|
|
|
|
County:  Yazoo
|
|
Begin:  11/27/24 08:00 AM
|
|
Traffic Impact:  Moderate
|
|
End:  11/20/26 05:00 PM
|
Direction:  Both Directions
|
|
Lanes:  Expect delays
|
Justification:  Road Work- Resurfacing or Paving
|
|
| | Additional Information:  Alternating lane closures. |
|
Last Updated:  06/12/25 01:55 PM
|
|
|
|